The first step to get temporary power to your construction site is the site visit

Preparing for Your Temporary Power Construction Site Visit

Getting temporary power for your construction site is a process. In order to develop a proposal for you, the power companies that you’re considering will need to do a site visit to determine the specific needs of the job. Below are some of the things the power company will look for to prepare your quote. 

What Happens During a Site Visit?

You will be dealing with a sales representative from the power company during your construction site visit. They will ask you a few questions to prepare a quote for you. 

During this visit, the power company will find out:

  • What you are building
  • If you will have any trailers and what size
  • If you need any special equipment like tower cranes, man-lifts, de-watering pumps and/or other 480 volt power needs
  • The duration of the job
  • What utility sources are available
  • The location of the source
  • Where power is needed around the job site

Related: Step-by-Step Guide: How Do I Get Temporary Power to My Construction Site?

Any power company you’re dealing with will need to ask these questions to figure out what kind of equipment you’ll need and for how long. This will also help inform the layout they design to go with your quote. With the answers to these questions, they will be able to design a quote based on your specific temporary power needs.

Once you begin the process of getting temporary power, it can take 1-8 months to get up and running.

After they have an idea of those answers, the potential power company will then walk around your site and look for a few things.

3 things they’ll look for:

  • The location of the source
  • What utility sources are available
  • The furthest point that power is needed

These details will help them design a layout for your construction site. Depending on your job site and where the utility sources are available, they will design a map with your input. However, the biggest thing the company takes into consideration is safety. There are several options for your job site, so your sales representative should design a safe, efficient layout to go along with the proposal.

Related: What is an Automatic Transfer Switch?

What Can I Do to Prepare for my Site Visit? 

To prepare for your site visit, make sure that you have the answers to all the questions above. 

The number one thing to do is contact power companies in advance. You need to do this for several reasons. First, you’ll want to gather quotes from a few companies and that takes time. If they each have to do a site visit, it can take a couple of weeks to get proposals in your hand. Then, once you accept a quote, it can take months to get temporary power. From paying utility fees and acquiring permits from the city, there’s a lot that goes into the process.

Overall, acquiring temporary power is a process and it takes time. If you’re prepared, the process will go smoothly. 

Power Plus! is a leading provider of reliable non-radioactive power generators across the United States and Canada.

Have a question or comment for Power Plus? We'd love to hear from you! 

Please provide your contact information and we'll get back to you as soon as we can. 

Contact Power Plus @ (800) 863-2525 | sales@powerplus.com 


See Our Other Power Posts!


Biomass Generator Electrifies Power Conference Facility

The western shore of Windermere meets electric. A give-star, gold-rated Silverholme Manor on the private Graythwaite estate has received a major facelift with 120-person capacity style theater for presentations and business seminars.
Read More

Convenience Stores Prep for Power Outages with Electric Generators

Hurricane Sandy was the wake up call we deserved. A spotlight has been shined on how important emergency backup power generators are.
Read More

Electrical Power Generators to Keep Water Flowing During Storm Season

In a very smart move, the Lehigh County Authority in Pennsylvania is spending an estimated $1.6 million to add emergency power generators to seven of its satellite water systems to avoid large storms from knocking out their power.
Read More

New Electrical Power Generators Run on Captured Byproduct in Colorado’s Zero-Energy District

An experiment supporting the development of the nation’s first major urban zero-energy district was conducted summer 2011. The plan integrates energy generation, storage, and conservation activities strategically to reduce an electricity grid’s overall energy load.
Read More

Emergency Power Generators May Become Mandatory at NY Gas Stations

Under the proposed legislation, gas station owners don’t have to sweat it. The stations can get up to a $10,000 grant to install the generators. But watch out: those that don’t comply face a $2,000 per day penalty until they comply.
Read More

Gas Stations Possibly Required to Install Backup Generators for Power

It’s always smarter to rent a generator than to purchase one. Not only is it a boatload cheaper but also companies such as Power Plus have trained professionals to help you maintain the generator.
Read More

Squirrel Knocks Out Power Line for Water Supply, No Emergency Power Available

Tampa’s entire water system went offline last Friday. Looks like a squirrel chewed through the power line, forcing half a million customers to boil their drinking water through the weekend.
Read More

Landslide Rescue Workers in China Rely on Power Generators

With emergency power generators powering up lighting sources, rescue workers are now able to work through the night, allowing them to quickly determine how many additional casualties may be involved.
Read More

Entergy Prepared to Provide Emergency Power During Ice Storm

Do you have an emergency power generator installed in your home? How reliable has it been? What about tech support?
Read More

Government to Provide Generators for Power

A state program is being petitioned which will provide residents with a number of small portable emergency generators in case of a blackout.
Read More

Building Managers Come to the Rescue with Power Generators

When Hurricane Sandy swept the East Coast this past fall, building owners and managers who were left without light, water or heat had to be come up with imaginative ways to meet their renters needs…
Read More

© Copyright: PowerPlus All Rights Reserved | Privacy Policy | Terms & Conditions | Customize Cookie Settings

Digital Marketing by: Kreative Webworks